RECENTLY COMPLETED
MAJOR PROJECTS
Enviro Lining has completed over 35 projects, and we have highlighted a selection of them to showcase the various materials used in the projects as well as the scale as shown in total quantities ranging from 10,000m2 to over 350,000m2.
PROJECT
St Heliers Correctional Centre STP
12,000
Size (m2)
NSW Public Works
Client
Muswellbrook NSW
Location
GCL
Materials Installed
KCE
Head Contractor
5 Days
Duration
Working at a Correctional Centre meant that our crew had to undergo vigorous inductions and security checks. Enviro Lining installed 12,000m2 of GCL over two sewerage treatment ponds, we slowed our installation down slightly to assist the contractor with backfilling behind our installation.