RECENTLY COMPLETED
MAJOR PROJECTS
Enviro Lining has completed over 35 projects, and we have highlighted a selection of them to showcase the various materials used in the projects as well as the scale as shown in total quantities ranging from 10,000m2 to over 350,000m2.
PROJECT
Dungog Waste Water Treatment Works
11,200
Size (m2)
KCE
Client
Dungog
Location
HDPE & Geotextile
Materials Installed
–
Head Contractor
–
Duration
The NSW town of Dungog are upgrading their Waste Water Treatment Works through Hunter Water & John Holland Group. KCE engaged Enviro Lining to Supply & Install the Geotextile Underlay and HDPE Liner to the 3 ponds. There was 2 x Sludge Lagoons, and 1 x Wet Weather Storage pond.
Enviro Lining worked with our client to ensure the project was completed in an efficient manner, dealing with different weather impacts ranging from high winds, and rain events, to slight design changes.
All of JHG strict safety measures were easily adhered to, and all QA documentation was passed onto our client on the immediate completion of the works.