PROJECT

Dungog Waste Water Treatment Works

11,200

Size (m2)

KCE

Client

Dungog

Location

HDPE & Geotextile

Materials Installed

Head Contractor

Duration

The NSW town of Dungog are upgrading their Waste Water Treatment Works through Hunter Water & John Holland Group. KCE engaged Enviro Lining to Supply & Install the Geotextile Underlay and HDPE Liner to the 3 ponds. There was 2 x Sludge Lagoons, and 1 x Wet Weather Storage pond. 
 
Enviro Lining worked with our client to ensure the project was completed in an efficient manner, dealing with different weather impacts ranging from high winds, and rain events, to slight design changes.
 
All of JHG strict safety measures were easily adhered to, and all QA documentation was passed onto our client on the immediate completion of the works. 